![]() |
+39 051.739163 +39 051.3170105
|
Sito in lingua Italiana Web site in English |
Restricted Area Request login
|
The union between intrinsic clamping equipment and tools is set by the Work Cycle.
For new industrializations, the proposed integrated X-PRO is the real value added of the project: the identification of the optimal work cycle is the result of a fair balance between the choice of tools and definition of right clamping fixture.